V2 of my spool relocation for the SV08. I don't use the filament runout sensor so this allows you to attach the spool on the side and have the bowden tube attachment located on the top of the frame. You will need 2x M4x20mm bhs and 1x M3x6mm bhs to attach the bowden mount. Recommend 3 walls and 30% grid infill.
The author marked this model as their own original creation.