Organize and carry loose change for EDC. Will require a 1/4 inch 20 thread bolt and nut to complete the project.
25
56
0
735
updated March 31, 2020

Description

PDF

Organize and carry loose change for EDC.

Will require a 1/4 inch 20 thread bolt and nut to complete the project.

Tool to cut the bolt down to 17mm. (rotary tool with cutting wheel was used)
Mini torch to help heat up the nut to set and lock it in the cap.

Model origin

The author marked this model as their own original creation.

License