Assemble the modification as shown in the CAD drawing.
Use supports and print only in the default orientation
50% or higher infill is recommended with at least 3 walls
Use the cutting fixture to trim your PTFE tube to the proper length of 80mm for the stock hot-end
you will also need to use a 2 foot (600mm) stepper cable extender
The author hasn't provided the model origin yet.